Operational readiness, asset management & digital transformation

Reg. No: 1996/008398/07

Our solutions

Mine Readiness Management System, Digital Contract Mining Transformation

Mine Readiness Management System (MRMS)

An Estimating, Planning & Project Control Solution that links mine engineering with mining resources that analyse and optimise mine plan conformance, resource performance and mining cost – the ultimate mining project control solution.

MRMSlinksched

 RAPIDLY IMPORT MINE PLAN & PRODUCTION SCHEDULE ACTIVITIES INTO GANTT CHART INTERFACE TO ESTABLISH THE LINK BETWEEN MINE ENGINEERING AND MRMS.

Export mine plan and production activities into MRMSlinksched or import a Gantt Chart into MRMS to establish the link between Mine engineering and MRMS - a powerful estimating, planning and mining project control solution that can be applied to any mining project in any commodity at any time.  

MRMSresources

IMPORT SIMPLE MINING RESOURCES AND COSTS AND GENERATE COMPLEX RESOURCES FOR POWERFUL RESOURCE UTILISATION AND PROJECT ANALYSIS.

Global import or compile simple resources which reflect the costs/nett rate in any currency or use simple resources to generate the costs of complex resources – the greater the detail or component breakdowns, the deeper the level of resource usage and project analysis.

MRMSestimate

RESOURCE & PRODUCTION BASED ANALYTICAL ESTIMATING SOLUTION THAT FLOWS FROM PRE-TENDER TO POST TENDER PROJECT MANAGEMENT.

With high-level pricing or First Principle Resource-Based Estimating, MRMS equips the user with all the necessary facilities and reports to price mining projects rapidly, allowing project resources & costs to be depicted accurately from feasibility through project execution, to mining.

MRMSbudget

LINK AND INTEGRATE THE GANTT CHART ACTIVITIES WITH THE COST ESTIMATE TO GENERATE PRODUCTION AND COST FORECASTS.

Items from the mining activities are allocated to the Gantt Chart, which implies that the production schedule, mining resources (equipment, manpower, material, overheads, etc.) and mining resource costs are now all linked for ongoing project analysis, budgets & cost controls.

MRMSoptimise

THROUGH RESOURCE PROJECT ANALYSIS, STUDY THE RESOURCE ALLOCATIONS, USAGE & COSTS TO ENSURE THAT ALL RESOURCES ARE OPTIMALLY PLANNED.

Like no other mining project analysis solution on the market, MRMS optimises the mining resources and costs required to roll out the mine plan and budget forecast and ensure Mine Readiness of plans before execution, followed by MRMSprogress that monitors & tracks conformance.

MRMSprogress

ONGOING PROGRESS TRACKING TO PROVIDE AN AS-BUILT RECORD OF THE PROJECT. KEEP ORIGINAL NETWORK AS BASE & COMPARE AGAINST ACTUAL PROGRESS.

Want to achieve +90% mine plan and budget conformance, MRMS comprises of powerful mine plan and mining resource tracking capability which contains a wide variety of management reporting functionality to provide the latest progress of time, cost, budget and utilisation against the base plan.

MRMSvaluation

MRMSVALUATION PROVIDES CONTINUITY BETWEEN ESTIMATING & PROJECT MANAGEMENT COMMERCIAL CONTROL - ESSENTIAL ENGINEERING ANALYTICAL DETAIL.

In addition to catering for financial control of the mining project, the valuations module provides essential mine engineering info as a by-product. Produce full analytical detail of the budgeted use of resources or any part of the project, particularly useful when in Partnership with Client.

MRMScompare

EARNED VALUE MANAGEMENT (EVM) FOR CONTROL AND MEASUREMENT OF A PROJECTS PERFORMANCE. EVM TRACKS ALLOWED COSTS vs BUDGETS.

Optimise cost reporting with MRMScompare module which offers actual/allowable cost comparison and projected cost and time to complete data to produce accurate Earned Value Management (EVM) reporting. Rapidly assess & evaluate transparent data for quick decisions.

OUR PROMISE

01

Mining operations

Our purpose is to assist mining companies with the planning, development, implementation and support of Mining Projects that will give cause to optimised, improved mining operations and where construction is required to assist with on-time and below budget completion.

02

Asset Management

Not only is our ultimate goal to let your mining operation achieve efficiencies near or similar to autonomous mining, but to deliver this at a fraction of the cost associated with autonomy and should this be viable, pave the way to phase in autonomous solutions through cost savings realised.

03

Cost Engineering

Digital transformation is aimed at driving improvements in productivity, costs and safety. Since 1996 we have learned what it takes to actually transform performance in an operation, and it is much more than a technical solution. Tacmin Madini, is your trusted digital transformation partner.